{"id":826,"date":"2011-07-19T06:54:20","date_gmt":"2011-07-19T06:54:20","guid":{"rendered":"https:\/\/www.mth-partner.de\/rechtsanwaltsblog\/?p=826"},"modified":"2025-10-28T08:19:08","modified_gmt":"2025-10-28T08:19:08","slug":"erneuerbare-energien-landgericht-berlin-bestatigt-seine-entscheidung-im-verfahren-enercon-gegen-das-deutsche-atomforum","status":"publish","type":"post","link":"https:\/\/www.mth-partner.de\/en\/renewable-energies-berlin-regional-court-confirms-its-decision-in-the-enercon-v-deutsche-atomforum-case\/","title":{"rendered":"Renewable energies: Berlin Regional Court confirms its decision in the proceedings between Enercon and the German Atomic Forum"},"content":{"rendered":"<p><strong>Berlin Regional Court, 5 May 2011, Ref.: Ref. 91 O 35\/11<\/strong><\/p>\n<p>In January 2011, we reported on the preliminary injunction proceedings brought by the East Frisian company Enercon against the German Atomic Forum before the Berlin Regional Court (Ref.: 16 O 560\/10).<\/p>\n<p><a href=\"https:\/\/www.mth-partner.de\/en\/rechtsanwaltsblog\/erneuerbare-energien-windkraftanlagenhersteller-enercon-wehrt-sich-erfolgreich-gegen-atomlobby\/\">Renewable energies: Wind turbine manufacturer Enercon successfully defends itself against the nuclear lobby<\/a><\/p>\n<p>As part of its public relations work in favour of nuclear energy, the German Atomic Energy Forum had shown a photo of the Unterweser nuclear power plant in four advertisements, into which several wind turbines from the East Frisian company Enercon had been retouched by means of photomontage.<br \/>\nAbove the photo was the sentence \"Climate protectors among themselves - Unterweser nuclear power plant and wind energy: CO2 emissions = zero\".<\/p>\n<p>The company Enercon considered this installation to be a violation of competition law and filed an injunction against the image.<\/p>\n<p>In these proceedings, the Berlin Regional Court had already ruled that the German Atomic Energy Forum was anti-competitively transferring the good reputation of wind energy to nuclear power through the advert.<\/p>\n<p>This judgement has now been confirmed in the main proceedings with the above-mentioned ruling and it has been determined that the statements made in the advertisement by the Atomforum are inadmissibly misleading and damaging to the company's reputation.<\/p>\n<p>Source: Berlin Regional Court<\/p>\n<p><b>Important Note: The content of this article has been prepared to the best of our knowledge and belief. However, due to the complexity and constant evolution of the subject matter, we must exclude liability and warranty.<\/b> Important Notice: The content of this article has been created to the best of our knowledge and understanding. However, due to the complexity and constant changes in the subject matter, we must exclude any liability and warranty.<\/p>\n<p>If you need legal advice, feel free to call us at 0221 \u2013 80187670 or email us at info@mth-partner.de.<\/p>","protected":false},"excerpt":{"rendered":"<p>If a competitor uses the presentation of another manufacturer's products without having obtained its authorisation, this can easily lead to disputes under competition law.<\/p>","protected":false},"author":1,"featured_media":12249,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[39],"tags":[1899,1902],"class_list":["post-826","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-erneuerbare-energien","tag-windenergieanlagen","tag-windkraftanlagen"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Erneuerbare Energien: Landgericht Berlin best\u00e4tigt seine Entscheidung im Verfahren Enercon gegen das Deutsche Atomforum<\/title>\n<meta name=\"description\" content=\"Das Landgericht Berlin best\u00e4tigt seine Entscheidung im Verfahren Enercon gegen das Deutsche Atomforum.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.mth-partner.de\/en\/renewable-energies-berlin-regional-court-confirms-its-decision-in-the-enercon-v-deutsche-atomforum-case\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Erneuerbare Energien: Landgericht Berlin best\u00e4tigt seine Entscheidung im Verfahren Enercon gegen das Deutsche Atomforum\" \/>\n<meta property=\"og:description\" content=\"Das Landgericht Berlin best\u00e4tigt seine Entscheidung im Verfahren Enercon gegen das Deutsche Atomforum.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.mth-partner.de\/en\/renewable-energies-berlin-regional-court-confirms-its-decision-in-the-enercon-v-deutsche-atomforum-case\/\" \/>\n<meta property=\"og:site_name\" content=\"Rechtsanwaltskanzlei\u00a0Tieben\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/profile.php?id=100054481000178\" \/>\n<meta property=\"article:published_time\" content=\"2011-07-19T06:54:20+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-28T08:19:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.mth-partner.de\/wp-content\/uploads\/WhatsApp-Image-2025-10-28-at-12.11.36.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@mth_Tieben\" \/>\n<meta name=\"twitter:site\" content=\"@mth_Tieben\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Renewable energies: Berlin Regional Court confirms its decision in the proceedings between Enercon and the German Atomic Forum","description":"The Berlin Regional Court confirms its decision in the proceedings between Enercon and the German Atomic Forum.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.mth-partner.de\/en\/renewable-energies-berlin-regional-court-confirms-its-decision-in-the-enercon-v-deutsche-atomforum-case\/","og_locale":"en_GB","og_type":"article","og_title":"Erneuerbare Energien: Landgericht Berlin best\u00e4tigt seine Entscheidung im Verfahren Enercon gegen das Deutsche Atomforum","og_description":"Das Landgericht Berlin best\u00e4tigt seine Entscheidung im Verfahren Enercon gegen das Deutsche Atomforum.","og_url":"https:\/\/www.mth-partner.de\/en\/renewable-energies-berlin-regional-court-confirms-its-decision-in-the-enercon-v-deutsche-atomforum-case\/","og_site_name":"Rechtsanwaltskanzlei\u00a0Tieben","article_publisher":"https:\/\/www.facebook.com\/profile.php?id=100054481000178","article_published_time":"2011-07-19T06:54:20+00:00","article_modified_time":"2025-10-28T08:19:08+00:00","og_image":[{"width":1200,"height":600,"url":"https:\/\/www.mth-partner.de\/wp-content\/uploads\/WhatsApp-Image-2025-10-28-at-12.11.36.jpeg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_creator":"@mth_Tieben","twitter_site":"@mth_Tieben","twitter_misc":{"Written by":"admin","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.mth-partner.de\/erneuerbare-energien-landgericht-berlin-bestatigt-seine-entscheidung-im-verfahren-enercon-gegen-das-deutsche-atomforum\/#article","isPartOf":{"@id":"https:\/\/www.mth-partner.de\/erneuerbare-energien-landgericht-berlin-bestatigt-seine-entscheidung-im-verfahren-enercon-gegen-das-deutsche-atomforum\/"},"author":{"name":"admin","@id":"https:\/\/www.mth-partner.de\/#\/schema\/person\/5dc7cf455de54130946e3cac97f5dfbd"},"headline":"Erneuerbare Energien: Landgericht Berlin best\u00e4tigt seine Entscheidung im Verfahren Enercon gegen das Deutsche Atomforum","datePublished":"2011-07-19T06:54:20+00:00","dateModified":"2025-10-28T08:19:08+00:00","mainEntityOfPage":{"@id":"https:\/\/www.mth-partner.de\/erneuerbare-energien-landgericht-berlin-bestatigt-seine-entscheidung-im-verfahren-enercon-gegen-das-deutsche-atomforum\/"},"wordCount":262,"publisher":{"@id":"https:\/\/www.mth-partner.de\/#organization"},"image":{"@id":"https:\/\/www.mth-partner.de\/erneuerbare-energien-landgericht-berlin-bestatigt-seine-entscheidung-im-verfahren-enercon-gegen-das-deutsche-atomforum\/#primaryimage"},"thumbnailUrl":"https:\/\/www.mth-partner.de\/wp-content\/uploads\/WhatsApp-Image-2025-10-28-at-12.11.36.jpeg","keywords":["Windenergieanlagen","Windkraftanlagen"],"articleSection":["Erneuerbare Energien"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/www.mth-partner.de\/erneuerbare-energien-landgericht-berlin-bestatigt-seine-entscheidung-im-verfahren-enercon-gegen-das-deutsche-atomforum\/","url":"https:\/\/www.mth-partner.de\/erneuerbare-energien-landgericht-berlin-bestatigt-seine-entscheidung-im-verfahren-enercon-gegen-das-deutsche-atomforum\/","name":"Renewable energies: Berlin Regional Court confirms its decision in the proceedings between Enercon and the German Atomic Forum","isPartOf":{"@id":"https:\/\/www.mth-partner.de\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.mth-partner.de\/erneuerbare-energien-landgericht-berlin-bestatigt-seine-entscheidung-im-verfahren-enercon-gegen-das-deutsche-atomforum\/#primaryimage"},"image":{"@id":"https:\/\/www.mth-partner.de\/erneuerbare-energien-landgericht-berlin-bestatigt-seine-entscheidung-im-verfahren-enercon-gegen-das-deutsche-atomforum\/#primaryimage"},"thumbnailUrl":"https:\/\/www.mth-partner.de\/wp-content\/uploads\/WhatsApp-Image-2025-10-28-at-12.11.36.jpeg","datePublished":"2011-07-19T06:54:20+00:00","dateModified":"2025-10-28T08:19:08+00:00","description":"The Berlin Regional Court confirms its decision in the proceedings between Enercon and the German Atomic Forum.","breadcrumb":{"@id":"https:\/\/www.mth-partner.de\/erneuerbare-energien-landgericht-berlin-bestatigt-seine-entscheidung-im-verfahren-enercon-gegen-das-deutsche-atomforum\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.mth-partner.de\/erneuerbare-energien-landgericht-berlin-bestatigt-seine-entscheidung-im-verfahren-enercon-gegen-das-deutsche-atomforum\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.mth-partner.de\/erneuerbare-energien-landgericht-berlin-bestatigt-seine-entscheidung-im-verfahren-enercon-gegen-das-deutsche-atomforum\/#primaryimage","url":"https:\/\/www.mth-partner.de\/wp-content\/uploads\/WhatsApp-Image-2025-10-28-at-12.11.36.jpeg","contentUrl":"https:\/\/www.mth-partner.de\/wp-content\/uploads\/WhatsApp-Image-2025-10-28-at-12.11.36.jpeg","width":1200,"height":600,"caption":"Erneuerbare Energien"},{"@type":"BreadcrumbList","@id":"https:\/\/www.mth-partner.de\/erneuerbare-energien-landgericht-berlin-bestatigt-seine-entscheidung-im-verfahren-enercon-gegen-das-deutsche-atomforum\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.mth-partner.de\/"},{"@type":"ListItem","position":2,"name":"Erneuerbare Energien","item":"https:\/\/www.mth-partner.de\/en\/category\/erneuerbare-energien\/"},{"@type":"ListItem","position":3,"name":"Erneuerbare Energien: Landgericht Berlin best\u00e4tigt seine Entscheidung im Verfahren Enercon gegen das Deutsche Atomforum"}]},{"@type":"WebSite","@id":"https:\/\/www.mth-partner.de\/#website","url":"https:\/\/www.mth-partner.de\/","name":"Law firm Tieben","description":"Lawyer Tieben \/ Law firm Cologne","publisher":{"@id":"https:\/\/www.mth-partner.de\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.mth-partner.de\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/www.mth-partner.de\/#organization","name":"Law firm Tieben","url":"https:\/\/www.mth-partner.de\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.mth-partner.de\/#\/schema\/logo\/image\/","url":"https:\/\/www.mth-partner.de\/wp-content\/uploads\/logo.png","contentUrl":"https:\/\/www.mth-partner.de\/wp-content\/uploads\/logo.png","width":254,"height":52,"caption":"Rechtsanwaltskanzlei\u00a0Tieben"},"image":{"@id":"https:\/\/www.mth-partner.de\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/profile.php?id=100054481000178","https:\/\/x.com\/mth_Tieben","https:\/\/www.linkedin.com\/in\/helmer-tieben-09570226"]},{"@type":"Person","@id":"https:\/\/www.mth-partner.de\/#\/schema\/person\/5dc7cf455de54130946e3cac97f5dfbd","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/e5cd6a082a9610122b683548f09817f169e693adf042f28428cbf76b1ca03d2c?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/e5cd6a082a9610122b683548f09817f169e693adf042f28428cbf76b1ca03d2c?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e5cd6a082a9610122b683548f09817f169e693adf042f28428cbf76b1ca03d2c?s=96&d=mm&r=g","caption":"admin"}}]}},"_links":{"self":[{"href":"https:\/\/www.mth-partner.de\/en\/wp-json\/wp\/v2\/posts\/826","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mth-partner.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mth-partner.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mth-partner.de\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mth-partner.de\/en\/wp-json\/wp\/v2\/comments?post=826"}],"version-history":[{"count":2,"href":"https:\/\/www.mth-partner.de\/en\/wp-json\/wp\/v2\/posts\/826\/revisions"}],"predecessor-version":[{"id":12276,"href":"https:\/\/www.mth-partner.de\/en\/wp-json\/wp\/v2\/posts\/826\/revisions\/12276"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mth-partner.de\/en\/wp-json\/wp\/v2\/media\/12249"}],"wp:attachment":[{"href":"https:\/\/www.mth-partner.de\/en\/wp-json\/wp\/v2\/media?parent=826"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mth-partner.de\/en\/wp-json\/wp\/v2\/categories?post=826"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mth-partner.de\/en\/wp-json\/wp\/v2\/tags?post=826"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}